Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930362 (1) ·
930407 (1) ·
930439 (1) ·
934482 (1) ·
934489 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1) ·
937367 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'3 Miles West of SR-786 ' (1) ·
'AT SR-7 US-441 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'Southern Blvd / E-3 Canal' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)