Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-104 CANAL ' (1) ·
'C-37 Canal ' (1) ·
'CANAL C-104 ' (1) ·
'Canal C-46 ' (1) ·
'CANAL E-1 ' (1) ·
'CANAL E-4 ' (1) ·
'Indian River Relief ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'Nova Canal ' (1) ·
'RIO MAR BAY ' (1) ·
Indian River ICW (1)
'Americana Blvd. ' (1) ·
'ARMONE PLACE ' (1) ·
'Big Tree Road ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'DUNN ROAD ' (1) ·
'Eldron Blvd. ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'PEACHTREE BLVD. ' (1) ·
'Quantum Blvd. ' (1) ·
'SELVITZ ROAD ' (1) ·
'SR-518 ' (1) ·
'VETERANS WALK ' (1) ·
SR-518 (1)
700183 (1) ·
700184 (1) ·
705917 (1) ·
705918 (1) ·
794154 (1) ·
885808 (1) ·
934482 (1) ·
934489 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1) ·
937367 (1) ·
945269 (1) ·
945270 (1) ·
945271 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.2MI. W of NW STJAMES DR' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.5MI S of CR 712 ' (1) ·
'0.5MI S of CR-712 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'100 ft E of Minton Road ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'AT SR-7 US-441 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'SR-5A - Big Tree Rd ' (1) ·
SR-518 over Indian River (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 19 results in range #1 to #19.