Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'C-18 Canal ' (1) ·
'Donald Ross Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-91 (Fla. Turnpike) ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'TEN MILE CREEK ' (1) ·
'W. Relief Indian River ' (1)
'COUNTRY CLUB DRIVE' (1) ·
'CR-603-IND RIV BLV' (1) ·
'EB 706 To SB I-95 ' (1) ·
'GORDY ROAD ' (1) ·
'Hood Road ' (1) ·
'Indiantown Rd. ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'S. VERDE TRAIL ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
884053 (1) ·
884054 (1) ·
890138 (1) ·
930371 (1) ·
930372 (1) ·
930374 (1) ·
930380 (1) ·
930382 (1) ·
930383 (1) ·
930384 (1) ·
930385 (1) ·
930386 (1) ·
930387 (1) ·
930390 (1) ·
930391 (1) ·
930398 (1) ·
934903 (1) ·
934908 (1) ·
944010 (1)
'.5 mi East of I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'At S Military Trail ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'South of Ramp to SR 706 ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
'Tpk. / SR 706 Interchange' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)