Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'E-1 CANAL ' (1) ·
'I-95 (SR-9) ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'TEN MILE CREEK ' (1) ·
'W. Relief Indian River ' (1)
'COUNTRY CLUB DRIVE' (1) ·
'EB 706 To SB I-95 ' (1) ·
'GORDY ROAD ' (1) ·
'Haverhill Rd ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'S. VERDE TRAIL ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
884053 (1) ·
890128 (1) ·
890129 (1) ·
890138 (1) ·
930371 (1) ·
930372 (1) ·
930380 (1) ·
930384 (1) ·
930385 (1) ·
930390 (1) ·
934295 (1) ·
934313 (1) ·
934903 (1) ·
934908 (1) ·
934924 (1) ·
934927 (1) ·
944010 (1)
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'At S Military Trail ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.