Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'E-1 CANAL ' (1) ·
'I-95 (SR-9) ' (1) ·
'Konomac Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'St. Lucie Canal ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1)
'COUNTRY CLUB DRIVE' (1) ·
'CR-603-IND RIV BLV' (1) ·
'Fort Florida Road ' (1) ·
'Haverhill Rd ' (1) ·
'Indiantown Rd. ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'S. VERDE TRAIL ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'Volco Road ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
794131 (1) ·
794133 (1) ·
794162 (1) ·
884053 (1) ·
884054 (1) ·
890121 (1) ·
890122 (1) ·
890132 (1) ·
890133 (1) ·
930371 (1) ·
930372 (1) ·
930380 (1) ·
930385 (1) ·
930386 (1) ·
930387 (1) ·
930390 (1) ·
930391 (1) ·
934295 (1) ·
934313 (1) ·
934903 (1) ·
934924 (1)
'.5 mi East of I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'At S Military Trail ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'South of Ramp to SR 706 ' (1)
26205893 (1) ·
26212624 (1) ·
26360809 (1) ·
26403896 (1) ·
26554700 (1) ·
26554800 (1) ·
26560311 (1) ·
26560443 (1) ·
26560450 (1) ·
26560606 (1) ·
26561100 (1) ·
26561248 (1) ·
27070958 (1) ·
27071400 (1) ·
27072925 (1) ·
27073032 (1) ·
27373700 (1) ·
27385877 (1) ·
28515436 (1) ·
28543436 (1) ·
28544228 (1)
80071317 (1) ·
80074514 (1) ·
80083165 (1) ·
80085370 (1) ·
80085515 (1) ·
80085650 (1) ·
80085950 (1) ·
80090063 (1) ·
80090130 (1) ·
80090683 (1) ·
80112200 (1) ·
80121038 (1) ·
80160809 (1) ·
80161732 (1) ·
80164549 (1) ·
80164845 (1) ·
80224294 (1) ·
80232401 (1) ·
80543046 (1) ·
80544759 (1) ·
81205307 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)