Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Central Blvd ' (1) ·
'CR 76A ' (1) ·
'CR708 125.4 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'I 95 SR 9 ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Old Dixie Highway ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-80 EB ' (1) ·
'SR-80 WB ' (1) ·
'SR786 WB to SB I95' (1) ·
'WB 706 To SB I-95 ' (1) ·
'WB SR 70 ' (1)
890114 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890119 (1) ·
890130 (1) ·
890131 (1) ·
930354 (1) ·
930355 (1) ·
930359 (1) ·
930375 (1) ·
930376 (1) ·
930378 (1) ·
930379 (1) ·
930381 (1) ·
930388 (1) ·
930419 (1) ·
940119 (1)
'0.1 MILE WEST OF I-95 ' (1) ·
'0.25 mile North of SR 786' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1 mi. N of Cnty Rd 708 ' (1) ·
'1 mile North of SR 786 ' (1) ·
'1.7 miles North of SR 706' (1) ·
'16Mi W of SR-7 ' (1) ·
'2.5 miles North of SR-706' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'CR 76A over I-95 ' (1) ·
'I 95 SR 706 interchange ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)