Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700178 (1) ·
790128 (1) ·
794123 (1) ·
794124 (1) ·
880085 (1) ·
890093 (1) ·
890102 (1) ·
894047 (1) ·
894048 (1) ·
934904 (1) ·
934914 (1) ·
935750 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-50 1.0 Mi East of I-95' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)