Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CPB20 CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Indian River IWW ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Turkey Creek ' (1)
'EB SR - 714 ' (1) ·
'GOLDFINCH LANE ' (1) ·
'I 95 NB SR 9 ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SW GREENRIDGE LANE' (1) ·
'US-192 WB ' (1) ·
'WB Lake Worth Rd. ' (1)
700174 (1) ·
704203 (1) ·
705910 (1) ·
890134 (1) ·
894049 (1) ·
930319 (1) ·
930328 (1) ·
930335 (1) ·
930336 (1) ·
934221 (1) ·
937354 (1) ·
937360 (1) ·
940101 (1) ·
940102 (1)
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At Lake Washington Rd ' (1) ·
'US-192 WB-Indian River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)