Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'Boynton Canal C-16 ' (1) ·
'Boynton Inlet ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL L-30 ' (1) ·
'CSX RR ' (1) ·
'FELLSMERE CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'Sykes Creek ' (1)
'10th Ave. North ' (1) ·
'10th Ave North ' (1) ·
'BELVEDERE RD EB ' (1) ·
'BELVEDERE RD WB ' (1) ·
'BIG BLUE TRACE ' (1) ·
'BOBWHITE ROAD ' (1) ·
'COUNTY RD 507 ' (1) ·
'EL CLAIR RANCH RD.' (1) ·
'I 95 SR 9 ' (1) ·
'Jupiter Blvd. ' (1) ·
'LA MANCHA AVE. ' (1) ·
'RAVEN COURT ' (1) ·
'Richland Ave ' (1) ·
'SR A1A ' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SW 18th STREET EB ' (1)
704013 (1) ·
705909 (1) ·
880076 (1) ·
930061 (1) ·
930260 (1) ·
930263 (1) ·
930273 (1) ·
930287 (1) ·
930294 (1) ·
934205 (1) ·
934206 (1) ·
934212 (1) ·
934419 (1) ·
934900 (1) ·
937353 (1) ·
937357 (1) ·
937358 (1) ·
940121 (1)
'0.03MI W OF DOVE CIRCLE ' (1) ·
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'0.7 mile North of SR 804 ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'10th Ave North over I 95 ' (1) ·
'10th Ave over I 95 ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'1MI W OF SR 809 ' (1) ·
'4.2MI N OF CR-512 ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'I-95 / SR 882 ' (1)
11100 (1) ·
116000 (1) ·
1227 (1) ·
1700 (1) ·
190500 (1) ·
2059 (1) ·
22000 (1) ·
22500 (1) ·
226000 (1) ·
28500 (1) ·
400 (1) ·
500 (1) ·
6800 (1) ·
6900 (1) ·
9633 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
11174 (1) ·
11798 (1) ·
11971 (1) ·
1419 (1) ·
19258 (1) ·
201260 (1) ·
2950 (1) ·
330518 (1) ·
3572 (1) ·
38170 (1) ·
39038 (1) ·
392110 (1) ·
49448 (1) ·
600 (1) ·
694 (1)
Showing below up to 18 results in range #1 to #18.