Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Inlet ' (1) ·
'Canal ' (1) ·
'Canal C-47 ' (1) ·
'Canal C-48 ' (1) ·
'CANAL L-30 ' (1) ·
'CSX Railroad ' (1) ·
'DRAINAGE CANAL ' (1) ·
'FELLSMERE CANAL ' (1) ·
'Groover Creek ' (1) ·
'Hypoluxo Rd. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Little Haw Creek ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1)
'Airport Road ' (1) ·
'BELVEDERE RD EB ' (1) ·
'BELVEDERE RD WB ' (1) ·
'BOBWHITE ROAD ' (1) ·
'Brittan Avenue ' (1) ·
'Caballero Ave ' (1) ·
'COUNTY RD 507 ' (1) ·
'CR-606 Oslo Rd. ' (1) ·
'EL CLAIR RANCH RD.' (1) ·
'Eldron Blvd ' (1) ·
'Entrnce Rd to FDOT' (1) ·
'Jupiter Blvd. ' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'LA MANCHA AVE. ' (1) ·
'Marsh Road ' (1) ·
'RAVEN COURT ' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR A1A ' (1) ·
'SR-710 Beeline Hwy' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SW 18TH STREET WB ' (1) ·
'SW 23 Ave Golf Rd ' (1)
704019 (1) ·
705909 (1) ·
705913 (1) ·
705914 (1) ·
705915 (1) ·
705916 (1) ·
794036 (1) ·
794067 (1) ·
880071 (1) ·
880076 (1) ·
890106 (1) ·
930061 (1) ·
930299 (1) ·
930303 (1) ·
930304 (1) ·
934205 (1) ·
934206 (1) ·
934419 (1) ·
934428 (1) ·
934901 (1) ·
937353 (1) ·
937357 (1) ·
937358 (1) ·
940121 (1)
'0.03MI W OF DOVE CIRCLE ' (1) ·
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.1 miles North of US-92 ' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'1MI W OF SR 809 ' (1) ·
'4.2MI N OF CR-512 ' (1) ·
'5.8 Miles West of SR-76 ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Just West of I 95 ' (1) ·
'Oslo Rd. over I-95 ' (1) ·
'Over I 95 1 mi S of SR804' (1)
26195525 (1) ·
26225750 (1) ·
26290227 (1) ·
26302755 (1) ·
26302760 (1) ·
26324386 (1) ·
26342200 (1) ·
26413242 (1) ·
26413281 (1) ·
26415742 (1) ·
26420973 (1) ·
26430840 (1) ·
27034414 (1) ·
27163478 (1) ·
27351672 (1) ·
27491949 (1) ·
27583729 (1) ·
27583761 (1) ·
27590343 (1) ·
27590359 (1) ·
28004888 (1) ·
28171453 (1) ·
29043231 (1) ·
29162604 (1)
80023594 (1) ·
80041140 (1) ·
80042900 (1) ·
80043530 (1) ·
80074091 (1) ·
80074092 (1) ·
80074383 (1) ·
80082019 (1) ·
80120021 (1) ·
80125285 (1) ·
80130371 (1) ·
80130754 (1) ·
80213627 (1) ·
80300075 (1) ·
80315267 (1) ·
80362564 (1) ·
80394165 (1) ·
80394182 (1) ·
80400209 (1) ·
80400429 (1) ·
80414817 (1) ·
80443323 (1) ·
81074043 (1) ·
81162375 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)