Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Airport Road ' (1) ·
'Brittan Avenue ' (1) ·
'Caballero Ave ' (1) ·
'CR-606 Oslo Rd. ' (1) ·
'Eldron Blvd ' (1) ·
'Entrnce Rd to FDOT' (1) ·
'Hypoluxo to SB I95' (1) ·
'I 95 SR 9 SB ' (1) ·
'Lantana to I 95 SB' (1) ·
'Marsh Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR 812 Lantana Rd ' (1) ·
'Woolbright Road ' (1)
704019 (1) ·
705913 (1) ·
705914 (1) ·
705915 (1) ·
705916 (1) ·
794036 (1) ·
794067 (1) ·
880071 (1) ·
930274 (1) ·
930276 (1) ·
930291 (1) ·
930292 (1) ·
930298 (1) ·
930299 (1) ·
930300 (1)
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.1 miles North of US-92 ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Oslo Rd. over I-95 ' (1) ·
'W of I 95 on Woolbright ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.