Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700084 (1) ·
700085 (1) ·
700086 (1) ·
700087 (1) ·
700089 (1) ·
700090 (1) ·
700150 (1) ·
700151 (1) ·
700153 (1) ·
700216 (1) ·
794061 (1) ·
930202 (1) ·
934275 (1)
'0.5MI EAST OF I-95 ' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'0.9 mile North of CR-40A ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'2.2 Mi East of SR-528 ' (1) ·
'2.7 MI WEST OF SR-9 I-95 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'SR-528 WB-St Johns River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)