Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'CITY OF WPB CANAL ' (1) ·
'COLLIER WATERWAY ' (1) ·
'Deep Creek ' (1) ·
'E-1-E CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Palmetto Park Road ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-513 ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'AUSTRALIAN AVE SB ' (1) ·
'CRESTHAVEN BLVD ' (1) ·
'ENGLAR DRIVE ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'PONCE DE LEON ST ' (1) ·
'ROYAL PALM BCH BLV' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'SANDALFOOT BLVD ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-407 ' (1) ·
'SW 18th Street ' (1) ·
'SW THIRD ST ' (1) ·
'US-17 ' (1) ·
'W. CAMINO REAL ' (1)
700083 (1) ·
700091 (1) ·
700149 (1) ·
790002 (1) ·
885603 (1) ·
930184 (1) ·
930187 (1) ·
930188 (1) ·
930197 (1) ·
930198 (1) ·
934278 (1) ·
934326 (1) ·
934402 (1) ·
934403 (1) ·
934406 (1) ·
937350 (1) ·
937351 (1) ·
937352 (1) ·
937355 (1)
'0.1MI N OF OKEECHOBEE BLV' (1) ·
'0.25 mi. N of County Line' (1) ·
'0.3MI E OF SR-7 US-441 ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5MI W OF HAVERHILL ROAD' (1) ·
'0.8MI N OF SR 80 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.3MI N OF SR-80 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'At SR-7/US-441 ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Boca Raton ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'US-17 over Deep Creek ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)