Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'Cabbage Slough ' (1) ·
'CR-5A ' (1) ·
'FECRR ' (1) ·
'HUNGERFORD CANAL ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Maytown Rd. ' (1) ·
'Maytown Road ' (1) ·
'Sottile Canal ' (1) ·
'SR-44 ' (1) ·
'SR-442 ' (1) ·
I-95 (1) ·
Sottile Canal (1)
'AUDUBON BLVD. ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-4118 ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'SANDALFOOT BLVD EB' (1) ·
'SANDALFOOT BLVD WB' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-46 ' (1) ·
'SR-520 EB ' (1) ·
'WEST OCEAN DRIVE ' (1) ·
Grant Rd. (1) ·
I-95 (1) ·
Micco Rd. (1) ·
Valkaria Road (1)
700002 (1) ·
700096 (1) ·
700102 (1) ·
700103 (1) ·
700137 (1) ·
700155 (1) ·
700156 (1) ·
700157 (1) ·
700158 (1) ·
700159 (1) ·
790028 (1) ·
790058 (1) ·
790059 (1) ·
790062 (1) ·
790063 (1) ·
790064 (1) ·
790065 (1) ·
790066 (1) ·
930056 (1) ·
934404 (1) ·
934405 (1) ·
934470 (1) ·
935300 (1) ·
935502 (1)
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'2.7Mi. N of SR-44 ' (1) ·
'At US-441/SR-7 ' (1) ·
'I-95 NB - Maytown Road ' (1) ·
'I-95 NB - SR-44 ' (1) ·
'I-95 NB over SR-442 ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'I-95 SB - Sottile Canal ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'I-95 SB-Maytown Road ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-46 - Cabbage Slough ' (1) ·
1.3 Mi. East of CR-507 (1) ·
1.9MI E of Babcock St. (1) ·
I-95 NB - Sottile Canal (1) ·
I-95 NB and CR-5A (1) ·
Valkaria Road and I-95 (1)
26200900 (1) ·
26201002 (1) ·
26252844 (1) ·
26254577 (1) ·
26312770 (1) ·
26570930 (1) ·
27522524 (1) ·
27531801 (1) ·
27531806 (1) ·
27552820 (1) ·
27571292 (1) ·
28212281 (1) ·
28313962 (1) ·
28314033 (1) ·
28415195 (1) ·
28461638 (1) ·
28461701 (1) ·
28495879 (1) ·
28495944 (1) ·
28570264 (1) ·
28570267 (1) ·
29004602 (1) ·
29004609 (1) ·
29025129 (1)
80044370 (1) ·
80050324 (1) ·
80050363 (1) ·
80053227 (1) ·
80120952 (1) ·
80120955 (1) ·
80352983 (1) ·
80353417 (1) ·
80353519 (1) ·
80360839 (1) ·
80363510 (1) ·
80430520 (1) ·
80472690 (1) ·
80472715 (1) ·
80533778 (1) ·
80533868 (1) ·
80544266 (1) ·
80544355 (1) ·
80570125 (1) ·
80570342 (1) ·
80591524 (1) ·
80591757 (1) ·
81002171 (1) ·
81002535 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)