Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Built 027: 1967 & Channel 061 : Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. or Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.

Use the filters below to narrow your results.

ObjectID:
Status:
Date:
County 003:
Place 004:
Route 005d:
Direction 005e:
Critical 006b:
Number 008:
Latitude 016:
Longitude 017:
Owner 022:
Built 027: (Click arrow to add another value)
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service On 042a:
Service Under 042b:
Kind 043a:
Type 043b:
Length 049:
Width 052:
Deck 058:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 2 results in range #1 to #2.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)