Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Belcher Canal (C-25) ' (1) ·
'Boca Inlet ' (1) ·
'Boynton Canal C16 ' (1) ·
'C-18 CANAL ' (1) ·
'CANAL ' (1) ·
'Canal L-14 ' (1) ·
'CR-515 & Indian River ' (1) ·
'H-20 CANAL ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-406 ' (1) ·
'Sykes Creek ' (1) ·
'US-1 & FECRR ' (1)
'97 TH STREET ' (1) ·
'A1A ' (1) ·
'AVENUE OF PGA ' (1) ·
'Congress Ave. ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'ELLISON WILSON RD ' (1) ·
'HICKORY DRIVE ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Kings Highway ' (1) ·
'LARCH AVE ' (1) ·
'Service Road ' (1) ·
'SR-401 SB ' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR-A1A ' (1) ·
'US1(SR5) ' (1)
700014 (1) ·
700015 (1) ·
700025 (1) ·
700028 (1) ·
700030 (1) ·
700031 (1) ·
700059 (1) ·
700134 (1) ·
704048 (1) ·
880044 (1) ·
884003 (1) ·
930001 (1) ·
930060 (1) ·
930163 (1) ·
930356 (1) ·
934131 (1) ·
937005 (1) ·
937006 (1) ·
937007 (1) ·
940007 (1) ·
940045 (1)
'0.1 MI S of PGA BLVD ' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'0.7MI W OF SR-401 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1.3MI N OF PGA BLVD ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'AT 141st ST ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'SR-528 WB - Sykes Creek ' (1) ·
'SR-528 WB - US-1 & FECRR ' (1)
26202096 (1) ·
26322094 (1) ·
26360932 (1) ·
26500997 (1) ·
26501040 (1) ·
26501044 (1) ·
26502431 (1) ·
26515320 (1) ·
27281242 (1) ·
27282176 (1) ·
27445538 (1) ·
27461915 (1) ·
28240145 (1) ·
28240489 (1) ·
28241892 (1) ·
28241941 (1) ·
28243313 (1) ·
28243314 (1) ·
28365858 (1) ·
28365910 (1) ·
28370440 (1)
80032688 (1) ·
80034800 (1) ·
80042082 (1) ·
80052230 (1) ·
80062177 (1) ·
80064587 (1) ·
80071574 (1) ·
80095948 (1) ·
80192117 (1) ·
80235687 (1) ·
80291224 (1) ·
80365155 (1) ·
80375608 (1) ·
80375690 (1) ·
80384626 (1) ·
80413927 (1) ·
80444580 (1) ·
80451074 (1) ·
80480991 (1) ·
80510378 (1) ·
80510486 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)