Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ATLANTIS WATERWAY ' (1) ·
'BELCHER CANAL C-25 ' (1) ·
'Blue Lake Equalizer ' (1) ·
'CAMINO CANAL ' (1) ·
'CANAL-1 ' (1) ·
'EL RIO CANAL ' (1) ·
'Gabordy's Canal ' (1) ·
'GARDEN CANAL ' (1) ·
'Halifax Canal Lateral ' (1) ·
'Halifax River ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'LWDD E-4 (El Rio) Canal ' (1) ·
'Nav. Banana River Canal ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'Sweetwater Branch ' (1)
'4TH STREET ' (1) ·
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'CYPRESS WAY ' (1) ·
'E. Minnesota Ave. ' (1) ·
'Girard Blvd. ' (1) ·
'Jackson Street ' (1) ·
'Magnolia Avenue ' (1) ·
'NW 20TH ST WB ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'Riverside Drive ' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'Taylor Rd ' (1) ·
'TROON DR ' (1)
704016 (1) ·
794010 (1) ·
794014 (1) ·
794015 (1) ·
795713 (1) ·
796412 (1) ·
880060 (1) ·
884022 (1) ·
934224 (1) ·
934421 (1) ·
935002 (1) ·
935204 (1) ·
935205 (1) ·
935206 (1) ·
935207 (1) ·
935209 (1) ·
935210 (1) ·
940041 (1) ·
940043 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.1MI E of SW 9TH AVE ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.2 Mi East of US-1 ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.6MI N OF ANGLE ROAD ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'200ft. S of 10th Street ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'AT 74TH AVE. ' (1) ·
'Canal View Blvd Intrsectn' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)