Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'DRAINAGE CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'HALF MILE LAKE ' (1) ·
'HOWARD CREEK ' (1) ·
'L.W.D.D. #10 ' (1) ·
'L.W.D.D. #9 ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SEBASTIAN RIVER PRONG ' (1)
'CR-505 ROSELAND RD' (1) ·
'CR-510 WABASSO RD ' (1) ·
'DAVIS ROAD ' (1) ·
'KELLER ROAD ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MISSION HILL ROAD ' (1) ·
'PINE LAKE ROAD ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SR-710 Beeline Hwy' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'WESTMORELAND BLVD ' (1)
880063 (1) ·
884019 (1) ·
890090 (1) ·
894001 (1) ·
934116 (1) ·
935305 (1) ·
936350 (1) ·
936550 (1) ·
937201 (1) ·
937202 (1) ·
940049 (1) ·
940067 (1) ·
945250 (1)
'0.2 MI W of I-95 ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'0.8Mi S of BRITT ROAD ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'8.9 miles west of SR-76 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)