Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'Canal ' (1) ·
'CANAL E-4 ' (1) ·
'Drainage Ditch ' (1) ·
'HALF MILE LAKE ' (1) ·
'Intracoastal Waterway ' (1) ·
'L.W.D.D. #10 ' (1) ·
'L.W.D.D. #9 ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SALERNO CREEK ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'Warner Creek ' (1)
790117 (1) ·
884019 (1) ·
890014 (1) ·
890087 (1) ·
894001 (1) ·
894041 (1) ·
930005 (1) ·
930344 (1) ·
935305 (1) ·
936350 (1) ·
937201 (1) ·
937202 (1) ·
940049 (1)
'.5mi W. of N. Lake Blvd. ' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'0.8Mi S of BRITT ROAD ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.6 mi E of US-1 ON 707A ' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'N of Roosevelt Bridge ' (1) ·
'New Smyrna Bch C.L. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)