Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
894014 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
934214 (1) ·
934502 (1) ·
934519 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1)
'0.2MI S OF US-27 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)