Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'E3 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I-95 ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'Lake Worth Lagoon ' (1) ·
'Loxahatchee Slough ' (1) ·
'Murray Creek ' (1) ·
'Platt Ranch Access Road ' (1) ·
'Reed Canal ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'WPB Canal (C-51) ' (1)
'AUDUBON CSWY ' (1) ·
'Bellevue Avenue ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'JOG ROAD (NB) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Lantern Park Drive' (1) ·
'McClure Road ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PGA Blvd (SR786) ' (1) ·
'PROSPERITY FARM RD' (1) ·
'SR A1A ' (1) ·
'St. Johns Heritage' (1) ·
'US-1 ' (1) ·
'Wickham Road ' (1)
704190 (1) ·
704197 (1) ·
790181 (1) ·
790241 (1) ·
796549 (1) ·
894051 (1) ·
930446 (1) ·
930547 (1) ·
930557 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934357 (1) ·
934951 (1) ·
934964 (1) ·
934965 (1) ·
936451 (1) ·
936701 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'4.3 Mi North of SR-44 ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'CR-509 .5 Mi N of SR-518 ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1)
26281579 (1) ·
26281595 (1) ·
26322077 (1) ·
26335150 (1) ·
26364799 (1) ·
26391800 (1) ·
26413216 (1) ·
26430558 (1) ·
26470845 (1) ·
26481006 (1) ·
26483417 (1) ·
26483495 (1) ·
26502490 (1) ·
26512989 (1) ·
26562633 (1) ·
26562955 (1) ·
27062187 (1) ·
28024500 (1) ·
28080403 (1) ·
29044616 (1) ·
29093020 (1) ·
29100400 (1)
80023637 (1) ·
80024030 (1) ·
80041600 (1) ·
80041852 (1) ·
80045351 (1) ·
80051796 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80075060 (1) ·
80075215 (1) ·
80075217 (1) ·
80084971 (1) ·
80092158 (1) ·
80102860 (1) ·
80161911 (1) ·
80401823 (1) ·
80402996 (1) ·
80448000 (1) ·
80572087 (1) ·
81002450 (1) ·
81045800 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
No deficiencies (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)