Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'E3 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I-4 ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'Lateral B Canal ' (1) ·
'Old Dixie Hwy. & FEC RR ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1)
'13th Street SW ' (1) ·
'Apollo Boulevard ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'DYER PARK ROAD ' (1) ·
'I-4 EB Ramp A ' (1) ·
'JOG ROAD (NB) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'McClure Road ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PROSPERITY FARM RD' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'US-1 (SR-5) SB ' (1)
705604 (1) ·
790208 (1) ·
880103 (1) ·
880104 (1) ·
880105 (1) ·
884105 (1) ·
894051 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934357 (1) ·
934951 (1) ·
934964 (1) ·
934965 (1) ·
936701 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'IN JOHN PRINCE PARK ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)