Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'Canal ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer WIldlife Crossing ' (1) ·
'E3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'KELLER CANAL ' (1) ·
'Lateral D Canal ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SR91 TPK (JUPITER INT) ' (1) ·
'SWA Retention Canal ' (1) ·
'WPB Canal (C-51) ' (1)
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Jog Road ' (1) ·
'LAKE IDA ROAD ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'S. Burnett Rd ' (1) ·
'SR 400 EB ' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR91 NB TPK 116.3 ' (1)
704193 (1) ·
790203 (1) ·
790204 (1) ·
790205 (1) ·
790206 (1) ·
790207 (1) ·
790247 (1) ·
884098 (1) ·
894051 (1) ·
930446 (1) ·
931012 (1) ·
934140 (1) ·
934148 (1) ·
934149 (1) ·
934158 (1) ·
934282 (1) ·
934357 (1) ·
934964 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'At Pluckebaum Rd ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1) ·
'SR 400 - Dear Crossing ' (1) ·
'SR 400 EB - Bear Crossing' (1) ·
'SR 400 EB - Cougar Crossi' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SR 91 at Jupiter Interch ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.