Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'E3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Horse Creek ' (1) ·
'I-95 ' (1) ·
'Indian River EastRelief ' (1) ·
'Indian River Relief ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'Lake Worth Relief ' (1) ·
'Lateral A Canal ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'Turnpike (SR-91) ' (1) ·
'WPB Canal (C-51) ' (1) ·
Zoo Trail (1)
'45th Street CR-702' (1) ·
'57th Street ' (1) ·
'BELVEDERE ROAD ' (1) ·
'Blue Heron Blvd ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'Croton Road ' (1) ·
'Dunn Avenue ' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'LAKE IDA ROAD ' (1) ·
'McClure Road ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PROSPERITY FARM RD' (1) ·
'US 192 WB ' (1) ·
'US-192 ' (1) ·
'US-192 EB ' (1) ·
Pineda Causeway (1)
700226 (1) ·
700233 (1) ·
700234 (1) ·
700235 (1) ·
704102 (1) ·
794189 (1) ·
884093 (1) ·
894051 (1) ·
930446 (1) ·
930545 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934166 (1) ·
934282 (1) ·
934357 (1) ·
934964 (1) ·
936701 (1)
.1 Mi E of I-95 (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.7 Miles N of Aurora Rd.' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1) ·
'SR-A1A East of ICWW ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-192 - Indian River Rel' (1) ·
'US-192 EB - Indian Riv ' (1)
26281579 (1) ·
26364799 (1) ·
26391800 (1) ·
26413216 (1) ·
26453630 (1) ·
26470126 (1) ·
26470845 (1) ·
26481006 (1) ·
26483417 (1) ·
26483495 (1) ·
26512989 (1) ·
26562633 (1) ·
26562955 (1) ·
27062187 (1) ·
27415031 (1) ·
28051366 (1) ·
28051434 (1) ·
28051925 (1) ·
28094049 (1) ·
28113400 (1) ·
29115274 (1)
80022352 (1) ·
80041600 (1) ·
80041852 (1) ·
80045351 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80075060 (1) ·
80075215 (1) ·
80075217 (1) ·
80080080 (1) ·
80092158 (1) ·
80161911 (1) ·
80274502 (1) ·
80343718 (1) ·
80345659 (1) ·
80345692 (1) ·
80391970 (1) ·
80402996 (1) ·
80422199 (1) ·
81054486 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)