Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'5th Street SW ' (1) ·
'Bay Drive ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CR-4009 ' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'LAKE IDA ROAD ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'River Drive ' (1) ·
'SR-406 ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 (SR-5) ' (1)
700227 (1) ·
794193 (1) ·
880089 (1) ·
884085 (1) ·
885811 (1) ·
885812 (1) ·
894051 (1) ·
930446 (1) ·
934140 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934357 (1) ·
934964 (1) ·
936776 (1)
'0.1 Mile West of A1A ' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'100Ft. South of Bay Drive' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'5th St. SW at CR-611 ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1) ·
'SR-406 over Indian River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)