Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'Banana River ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'E3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I-95 ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'Lake Gertie ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E3 Canal ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'SR 811 & FEC RR ' (1) ·
'St Johns River Relief ' (1) ·
'ST LUCIE CANAL ' (1) ·
'US-17-92-St Johns River ' (1) ·
'WPB Canal (C-51) ' (1) ·
Horse Creek (1)
'1st St SW ' (1) ·
'5th Street ' (1) ·
'Belvede to NB I-95' (1) ·
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'CR-612 8th Street ' (1) ·
'CR-92 EB ' (1) ·
'DYER PARK ROAD ' (1) ·
'EB SR 786 ' (1) ·
'Forest Hill Blvd. ' (1) ·
'I-4 EB ' (1) ·
'Investment Lane ' (1) ·
'LAKE IDA ROAD ' (1) ·
'McClure Road ' (1) ·
'PROSPERITY FARM RD' (1) ·
'SR-415 ' (1) ·
'SR-520 ' (1) ·
'SR-91 TPK NB 131.0' (1) ·
'Woolbright Road ' (1) ·
US-1 (1)
700206 (1) ·
700208 (1) ·
790197 (1) ·
790198 (1) ·
794186 (1) ·
884069 (1) ·
884072 (1) ·
884073 (1) ·
891000 (1) ·
894051 (1) ·
930446 (1) ·
930485 (1) ·
930491 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934162 (1) ·
934282 (1) ·
934357 (1) ·
934964 (1) ·
934965 (1) ·
934989 (1) ·
936701 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 Mile West of US 17-92' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.5 MI. W of Military Tr ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'1st overpass east of I-95' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'At 58th Ave ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1) ·
'North of Belvedere Rd ' (1) ·
'SR-415 - St Johns Relief ' (1) ·
'SR-520 - Banana River ' (1) ·
US-1 over Horse Creek (1)
26281579 (1) ·
26281595 (1) ·
26304669 (1) ·
26364799 (1) ·
26391800 (1) ·
26413216 (1) ·
26413700 (1) ·
26470845 (1) ·
26475245 (1) ·
26481006 (1) ·
26503600 (1) ·
26512989 (1) ·
26562633 (1) ·
26562955 (1) ·
27062187 (1) ·
27070395 (1) ·
27354128 (1) ·
27360764 (1) ·
27370020 (1) ·
28100028 (1) ·
28212680 (1) ·
28485599 (1) ·
28500676 (1) ·
29031634 (1)
80040300 (1) ·
80041600 (1) ·
80041852 (1) ·
80045351 (1) ·
80051796 (1) ·
80054600 (1) ·
80055517 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80075060 (1) ·
80075312 (1) ·
80092158 (1) ·
80161911 (1) ·
80162916 (1) ·
80264839 (1) ·
80264892 (1) ·
80264917 (1) ·
80384071 (1) ·
80393654 (1) ·
80402996 (1) ·
81112589 (1) ·
81184077 (1) ·
81190878 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.