Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'E3 CANAL ' (1) ·
'ELKCAM CANAL ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'ITCWD CANAL 3 ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'Lateral Canal 30 ' (1) ·
'LATERAL CANAL A ' (1) ·
'Little Haw Swamp ' (1) ·
'Murray Creek ' (1) ·
'Nova Canal ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'WPB Canal (C-51) ' (1)
'26TH STREET ' (1) ·
'AIROSO BLVD. ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'I 95 SR 9 ' (1) ·
'JOG ROAD (NB) ' (1) ·
'LAKE IDA ROAD ' (1) ·
'McClure Road ' (1) ·
'PROSPERITY FARM RD' (1) ·
'SR-5A ' (1) ·
'Truck Trail #12 ' (1) ·
'US-1 ' (1)
790177 (1) ·
790178 (1) ·
790181 (1) ·
790183 (1) ·
790184 (1) ·
790800 (1) ·
884061 (1) ·
894051 (1) ·
930446 (1) ·
930455 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934161 (1) ·
934291 (1) ·
934357 (1) ·
934951 (1) ·
934964 (1) ·
934965 (1) ·
936701 (1) ·
944013 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 Mi. S. of Beville Rd ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.6MI Nof PT ST LUCIE BLD' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'4.3 Mi North of SR-44 ' (1) ·
'AT CR-615 - 66TH AVE ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1) ·
'Lake George Conservation ' (1) ·
'SR-5A over Nova Canal ' (1) ·
'SR-5A over Nova Canal ' (1)
26281579 (1) ·
26281595 (1) ·
26290100 (1) ·
26322077 (1) ·
26364799 (1) ·
26391800 (1) ·
26412599 (1) ·
26470845 (1) ·
26481006 (1) ·
26512989 (1) ·
26525465 (1) ·
26562633 (1) ·
26562955 (1) ·
27062187 (1) ·
27173773 (1) ·
27384653 (1) ·
29044616 (1) ·
29091610 (1) ·
29093945 (1) ·
29101368 (1) ·
29102421 (1) ·
29153934 (1)
80040991 (1) ·
80041600 (1) ·
80041852 (1) ·
80045351 (1) ·
80050470 (1) ·
80051796 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80075060 (1) ·
80084971 (1) ·
80144092 (1) ·
80161911 (1) ·
80205857 (1) ·
80274670 (1) ·
80402996 (1) ·
80572087 (1) ·
81011090 (1) ·
81012273 (1) ·
81013312 (1) ·
81013879 (1) ·
81211913 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)