Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C STANLEY WEAVER CANAL ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'Eau Gallie River ' (1) ·
'EL RIO CANAL ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'L-5 Canal ' (1) ·
'Lateral B Canal ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'Old Dixie Hwy. & FEC RR ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'13th Street SW ' (1) ·
'Apollo Boulevard ' (1) ·
'CAMINO REAL ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'I-4 EB Ramp A ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'NB US-27 SR-25 ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'SR-520 ' (1) ·
'TROPICALIA AVE. ' (1) ·
'US-1 (SR-5) SB ' (1)
700193 (1) ·
705604 (1) ·
790171 (1) ·
790208 (1) ·
880103 (1) ·
880104 (1) ·
880105 (1) ·
884056 (1) ·
884105 (1) ·
894050 (1) ·
894052 (1) ·
930353 (1) ·
934240 (1) ·
934950 (1) ·
934960 (1) ·
940142 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'250ft North of SR-60 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Palm Beach - Broward Line' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)