Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'C-51 Canal ' (1) ·
'DANFORTH CREEK ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'L-78 Borrow Canal ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'M-2 CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'St. Johns Marsh ' (1) ·
'St. Sebastian River ' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'Becker Rd. ' (1) ·
'Cassadaga Road ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'ISLAND WAY ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'MAPP ROAD ' (1) ·
'Military Trail ' (1) ·
'MONET ROAD ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Port St. Lucie Bld' (1) ·
'Sebastian Blvd EB ' (1) ·
'Sebastian Blvd WB ' (1) ·
'SR 80/Southern Bld' (1) ·
'SR-520 ' (1) ·
'SR-60 ' (1) ·
'SR-60 WB ' (1) ·
'TROPICALIA AVE. ' (1)
700193 (1) ·
790171 (1) ·
790210 (1) ·
880087 (1) ·
880094 (1) ·
880096 (1) ·
884078 (1) ·
884079 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
894059 (1) ·
930460 (1) ·
930527 (1) ·
934126 (1) ·
934240 (1) ·
934950 (1) ·
936551 (1) ·
940142 (1) ·
941001 (1)
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.8 MI East of I-95 ' (1) ·
'Cassadaga Road over I-4 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-80 & Military Trail ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)