Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'Habitat Connectivity ' (1) ·
'Holly Drive ' (1) ·
'I-4 ' (1) ·
'I-4 EB ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'Loxahatchee Slough ' (1) ·
'M-2 CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Sykes Creek ' (1) ·
'Turnbull Creek ' (1) ·
'WARNER CREEK ' (1)
'27th Street ' (1) ·
'EB SR-710 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Graves Ave ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'I-95 (SR 9) ' (1) ·
'ISLAND WAY ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'MONET ROAD ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR-40 EB ' (1) ·
'SR-44 EB ' (1) ·
'SR-520 ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR-60 ' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'TROPICALIA AVE. ' (1) ·
'US-1 SB ' (1) ·
'WB SR-710 ' (1) ·
'WB US 98 SR 80 ' (1)
700193 (1) ·
700219 (1) ·
700220 (1) ·
790171 (1) ·
790189 (1) ·
790195 (1) ·
790217 (1) ·
790218 (1) ·
880087 (1) ·
884077 (1) ·
890150 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
930461 (1) ·
930517 (1) ·
930524 (1) ·
930535 (1) ·
930536 (1) ·
934126 (1) ·
934240 (1) ·
934950 (1) ·
936551 (1) ·
940142 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'Graves Ave over I-4 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-40EB - Habitat Connect' (1) ·
'SR-44 EB - I-4 ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-520 EB - Banana River ' (1) ·
'SR-520 WB - Banana River ' (1) ·
'US-1 SB - Turnbull Creek ' (1)
26322054 (1) ·
26403390 (1) ·
26403485 (1) ·
26422645 (1) ·
26492016 (1) ·
26492039 (1) ·
26492500 (1) ·
26501416 (1) ·
26562485 (1) ·
26583556 (1) ·
27060944 (1) ·
27122400 (1) ·
27134072 (1) ·
27162224 (1) ·
27385110 (1) ·
27390707 (1) ·
28212603 (1) ·
28212632 (1) ·
28212764 (1) ·
28491498 (1) ·
28565524 (1) ·
29010271 (1) ·
29131187 (1) ·
29153158 (1)
80040825 (1) ·
80041535 (1) ·
80041914 (1) ·
80055200 (1) ·
80075632 (1) ·
80095067 (1) ·
80101483 (1) ·
80101580 (1) ·
80113000 (1) ·
80140376 (1) ·
80162515 (1) ·
80184167 (1) ·
80213032 (1) ·
80225301 (1) ·
80242065 (1) ·
80385322 (1) ·
80385336 (1) ·
80404702 (1) ·
80513613 (1) ·
81061122 (1) ·
81110743 (1) ·
81135501 (1) ·
81153534 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)