Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'E3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'L-5 Canal ' (1) ·
'M-2 CANAL ' (1) ·
'RETENTION POND ' (1) ·
'SCOTTS CANAL ' (1) ·
'SIMS CREEK ' (1) ·
'WPB Canal (C-51) ' (1)
'BELVEDERE ROAD ' (1) ·
'CAMINO REAL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LAKE IDA ROAD ' (1) ·
'McClure Road ' (1) ·
'MONET ROAD ' (1) ·
'NB US-27 SR-25 ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'PROSPERITY FARM RD' (1)
930353 (1) ·
930446 (1) ·
934126 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934240 (1) ·
934282 (1) ·
934357 (1) ·
934950 (1) ·
934951 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
936551 (1) ·
936701 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1MI SW OF US-441 ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1) ·
'Palm Beach - Broward Line' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.