Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBARA BASIN ' (1) ·
'Berrys Canal ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'E-2-E Canal ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Indian River East Relief' (1) ·
'MAIN CANAL ' (1) ·
'Raulerson Canal ' (1) ·
'ROY'S SWALE ' (1) ·
'ST. LUCIE RIVER ' (1) ·
Banana River Relief (1)
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'EB SR60 ' (1) ·
'JOG ROAD ' (1) ·
'Lake Worth Road ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'S Williamson Blvd ' (1) ·
'Saxon Blvd EB ' (1) ·
'SILVER FOX LANE ' (1) ·
'SIMARA STREET ' (1) ·
'SR-44 ' (1) ·
'SR-60 WB ' (1) ·
'SR-700 ' (1) ·
'SR-732 Jensen Bch.' (1) ·
SR-520 (1)
700192 (1) ·
790149 (1) ·
790167 (1) ·
794095 (1) ·
884057 (1) ·
884059 (1) ·
890146 (1) ·
894042 (1) ·
895505 (1) ·
930451 (1) ·
930456 (1) ·
934155 (1) ·
934156 (1) ·
934297 (1) ·
944011 (1) ·
944012 (1)
'.75mi E. of Indian R Dr. ' (1) ·
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'3Mi. S of CR-717 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'S. Williamson BI-I-95 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1) ·
SR-520 - Banana River (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)