Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-3 CANAL ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lake Ida Road ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Rowland Canal ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 806 W Atlantic Avenue' (1)
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD WB ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD NB ' (1) ·
'LINTON BLVD ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR 80/Southern Bvd' (1) ·
'West Farms Road ' (1)
884076 (1) ·
894056 (1) ·
930484 (1) ·
930488 (1) ·
930489 (1) ·
930495 (1) ·
930496 (1) ·
930503 (1) ·
930504 (1) ·
930525 (1) ·
934297 (1) ·
934485 (1) ·
934939 (1) ·
934968 (1) ·
934969 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1.9Mi S OF WOOLBRIGHT ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'PBIA/I-95 Interchange ' (1)
101541 (1) ·
104500 (1) ·
114500 (1) ·
14878 (1) ·
17200 (1) ·
240 (1) ·
24000 (1) ·
28140 (1) ·
3400 (1) ·
5000 (1) ·
72500 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
125788 (1) ·
176174 (1) ·
181308 (1) ·
198658 (1) ·
25813 (1) ·
288 (1) ·
29842 (1) ·
41640 (1) ·
48823 (1) ·
5899 (1) ·
6000 (1)
Showing below up to 15 results in range #1 to #15.