Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790168 (1) ·
790169 (1) ·
790177 (1) ·
790178 (1) ·
790179 (1) ·
790180 (1) ·
790182 (1) ·
790183 (1) ·
790184 (1) ·
794096 (1) ·
884061 (1)
'0.4 Mi. S. of Beville Rd ' (1) ·
'1.4 miles North of US-92 ' (1) ·
'10thSt 1 Block E of Nova ' (1) ·
'2.2 Miles North of US-92 ' (1) ·
'8th St West of SR-5A ' (1) ·
'AT CR-615 - 66TH AVE ' (1) ·
'SR-40 west of SR-5A ' (1) ·
'SR-5A over Nova Canal ' (1) ·
'SR-5A at 3rd St ' (1) ·
'SR-5A over Nova Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)