Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'90th Ave. ' (1) ·
'Halifax Canal ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'Lateral "A" Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'Long Creek ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'N Fork St. Lucie River ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR 60 ' (1) ·
'SR-46 ' (1) ·
'St. Johns River Relief ' (1) ·
'Tomoka River ' (1)
'37th Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'66th Avenue ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'Daytona Avenue ' (1) ·
'HATTON HIGHWAY ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-415 ' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1)
700230 (1) ·
790201 (1) ·
790202 (1) ·
790220 (1) ·
795504 (1) ·
880101 (1) ·
880102 (1) ·
884099 (1) ·
884101 (1) ·
884102 (1) ·
884103 (1) ·
930447 (1) ·
934151 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934315 (1) ·
934553 (1) ·
940144 (1) ·
940145 (1)
'0.02 MI S/O LPGA Blvd ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1.2MI S OF US-98 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 over SR-60 ' (1) ·
'SR-415 -St. Johns Relief ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)