Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Clint Moore Road ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'I 95 and SR 704 ' (1) ·
'I-4 ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'Salerno Creek ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N. Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'Troup Indiantown Canal ' (1) ·
Indian River Relief East (1)
'CR726(CITRUS BLVD)' (1) ·
'Haverhill Rd ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARINA BLVD. ' (1) ·
'Saxon Blvd WB ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'US-1 NB ' (1) ·
'WB SR704 to SB I95' (1) ·
SR-520 (1)
700196 (1) ·
790156 (1) ·
790158 (1) ·
790160 (1) ·
790166 (1) ·
894053 (1) ·
894055 (1) ·
930447 (1) ·
930469 (1) ·
931000 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934359 (1) ·
934943 (1) ·
934944 (1) ·
940143 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'US-1 NB - Spruce Cr. S. ' (1) ·
'US-1 NB - Spruce Creek ' (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)