Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-37 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'CSX RR ' (1) ·
'E-2-W canal ' (1) ·
'FL TPK (SR-91) ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'M CANAL ' (1) ·
'N CANAL ' (1) ·
'Over D Canal ' (1) ·
'Rowland Canal ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 91 TPK ' (1) ·
'TIDAL CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'20TH AVENUE ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'E Gateway Blvd ' (1) ·
'HAVERHILL ROAD ' (1) ·
'HOOD RD 110.944 ' (1) ·
'INDIAN STREET ' (1) ·
'LYONS ROAD ' (1) ·
'Minton Rd. ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Palm Bay Library ' (1) ·
'Roebuck Road ' (1) ·
'SIMARA STREET ' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'SUMMIT BLVD ' (1) ·
'Tangerine Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'West Farms Road ' (1) ·
'YAMATO RD ' (1)
704143 (1) ·
704256 (1) ·
884062 (1) ·
884076 (1) ·
894040 (1) ·
894056 (1) ·
895504 (1) ·
930428 (1) ·
930433 (1) ·
930434 (1) ·
930438 (1) ·
930441 (1) ·
930448 (1) ·
930449 (1) ·
930525 (1) ·
930800 (1) ·
934228 (1) ·
934256 (1) ·
934283 (1) ·
934506 (1) ·
934731 (1) ·
934928 (1)
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'10ft. E of Minton Road ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'BOYNTON BCH EAST OF TPK ' (1) ·
'BOYNTON BCH WEST OF TPK ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'Minton Road-I-95 ' (1)
26233914 (1) ·
26314057 (1) ·
26314099 (1) ·
26314182 (1) ·
26314200 (1) ·
26330210 (1) ·
26330220 (1) ·
26394749 (1) ·
26404380 (1) ·
26404575 (1) ·
26410304 (1) ·
26441137 (1) ·
26442375 (1) ·
26450216 (1) ·
26515528 (1) ·
27011700 (1) ·
27102110 (1) ·
27111660 (1) ·
27351435 (1) ·
27355685 (1) ·
27594683 (1) ·
28025656 (1)
80041240 (1) ·
80041485 (1) ·
80070375 (1) ·
80074101 (1) ·
80074430 (1) ·
80075210 (1) ·
80080612 (1) ·
80084280 (1) ·
80101941 (1) ·
80102132 (1) ·
80102313 (1) ·
80110316 (1) ·
80112090 (1) ·
80120025 (1) ·
80123610 (1) ·
80162939 (1) ·
80242120 (1) ·
80254958 (1) ·
80285590 (1) ·
80321756 (1) ·
80401656 (1) ·
80401795 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)