Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th Street Canal ' (1) ·
'BOYNTON CANAL ' (1) ·
'C-37 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'Creek ' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'LATERAL B CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'M CANAL ' (1) ·
'N CANAL ' (1) ·
'Over D Canal ' (1) ·
'S-5 Discharge Canal ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'TIDAL CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'16TH ST ' (1) ·
'20TH AVENUE ' (1) ·
'Alta Drive ' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'E Gateway Blvd ' (1) ·
'HAVERHILL ROAD ' (1) ·
'HOOD RD 110.944 ' (1) ·
'Indian Lake Road ' (1) ·
'INDIAN STREET ' (1) ·
'JOG ROAD SB ' (1) ·
'Levee Road ' (1) ·
'LYONS ROAD ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'Palm Bay Library ' (1) ·
'PARK AVE. W. ' (1) ·
'SIMARA STREET ' (1) ·
'SUMMIT BLVD ' (1) ·
'Tangerine Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'YAMATO RD ' (1)
704256 (1) ·
790801 (1) ·
795503 (1) ·
884062 (1) ·
884066 (1) ·
894040 (1) ·
895504 (1) ·
930433 (1) ·
930434 (1) ·
930441 (1) ·
930800 (1) ·
930811 (1) ·
934160 (1) ·
934164 (1) ·
934228 (1) ·
934256 (1) ·
934294 (1) ·
934296 (1) ·
934506 (1) ·
934922 (1) ·
934923 (1) ·
934928 (1) ·
934938 (1) ·
934953 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'10ft. E of Minton Road ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'At LPGA Blvd. ' (1)
26212592 (1) ·
26212629 (1) ·
26233914 (1) ·
26284041 (1) ·
26290213 (1) ·
26321971 (1) ·
26330210 (1) ·
26330220 (1) ·
26394749 (1) ·
26410304 (1) ·
26415366 (1) ·
26421351 (1) ·
26442375 (1) ·
26450216 (1) ·
26475062 (1) ·
26515528 (1) ·
26525529 (1) ·
27102110 (1) ·
27111660 (1) ·
27355685 (1) ·
27375405 (1) ·
27594683 (1) ·
29095886 (1) ·
29143549 (1)
80040992 (1) ·
80041240 (1) ·
80041485 (1) ·
80052450 (1) ·
80070375 (1) ·
80074101 (1) ·
80074430 (1) ·
80085013 (1) ·
80111927 (1) ·
80112090 (1) ·
80120025 (1) ·
80121064 (1) ·
80121067 (1) ·
80123610 (1) ·
80142395 (1) ·
80143409 (1) ·
80162939 (1) ·
80242120 (1) ·
80264781 (1) ·
80321756 (1) ·
80401795 (1) ·
80492277 (1) ·
81025160 (1) ·
81091698 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.