Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'CSX RR ' (1) ·
'ELKCAM CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'JONES CREEK ' (1) ·
'N CANAL ' (1) ·
'None ' (1) ·
'Over D Canal ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 91 TPK ' (1) ·
'TIDAL CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'AIROSO BLVD. ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER STREET ' (1) ·
'DYER PARK ROAD ' (1) ·
'E Gateway Blvd ' (1) ·
'HOOD RD 110.944 ' (1) ·
'INDIAN STREET ' (1) ·
'McClure Road ' (1) ·
'NB I 95 to Gateway' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PROSPERITY FARM RD' (1) ·
'SIMARA STREET ' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'Tangerine Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1)
894040 (1) ·
894051 (1) ·
895504 (1) ·
930428 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930433 (1) ·
930434 (1) ·
930435 (1) ·
930441 (1) ·
930800 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934506 (1) ·
936701 (1) ·
944013 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.6MI Nof PT ST LUCIE BLD' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'700 ft S of Gateway Blvd ' (1)
26312802 (1) ·
26313526 (1) ·
26313548 (1) ·
26314099 (1) ·
26315179 (1) ·
26325800 (1) ·
26330210 (1) ·
26330220 (1) ·
26410304 (1) ·
26442375 (1) ·
26470845 (1) ·
26481006 (1) ·
26483417 (1) ·
26483495 (1) ·
26512989 (1) ·
26515528 (1) ·
26562633 (1) ·
26562955 (1) ·
27062187 (1) ·
27102110 (1) ·
27111660 (1) ·
27173773 (1)
80041200 (1) ·
80041240 (1) ·
80041485 (1) ·
80041852 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80074430 (1) ·
80075215 (1) ·
80075217 (1) ·
80101974 (1) ·
80101977 (1) ·
80102132 (1) ·
80102271 (1) ·
80102293 (1) ·
80112090 (1) ·
80123610 (1) ·
80161911 (1) ·
80162939 (1) ·
80205857 (1) ·
80321756 (1) ·
80402996 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.