Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'CANAL ' (1) ·
'CYPRESS CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'Platt Ranch Access Road ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'RCA CANAL ' (1) ·
'Reed Canal ' (1) ·
'Sykes Creek ' (1)
'AUDUBON CSWY ' (1) ·
'Bellevue Avenue ' (1) ·
'FLYING COW ROAD ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'JOG ROAD SB ' (1) ·
'Lantern Park Drive' (1) ·
'LINTON BLVD. ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'NW 7TH STREET ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PALMWOOD ROAD ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'Sea Ray Drive ' (1) ·
'St. Johns Heritage' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
704144 (1) ·
704190 (1) ·
790241 (1) ·
796549 (1) ·
934136 (1) ·
934139 (1) ·
934222 (1) ·
934292 (1) ·
934346 (1) ·
934468 (1) ·
934469 (1) ·
934483 (1) ·
934913 (1) ·
934918 (1) ·
934934 (1) ·
934935 (1) ·
935221 (1) ·
936451 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.9 Miles South of US-192' (1) ·
'AT SR-80 ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)