Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-1 Canal ' (1) ·
'Cambridge Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Lateral A Canal ' (1) ·
'Long Creek ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'Okeechobee Waterway ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'SR 70 ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR-91 Turnpike ' (1) ·
'US 92 ' (1) ·
Addison Canal (1)
'33rd Street ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR-714 Indian St. ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'EB Okee. Blvd. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'I-4 Ramp B ' (1) ·
'JOG ROAD (SB) ' (1) ·
'Palm Bay Parkway ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'Trailwood Drive ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1) ·
I-95 (1)
700229 (1) ·
705924 (1) ·
790248 (1) ·
796414 (1) ·
884100 (1) ·
884104 (1) ·
894062 (1) ·
930418 (1) ·
931013 (1) ·
934346 (1) ·
934369 (1) ·
934468 (1) ·
934469 (1) ·
934913 (1) ·
940135 (1) ·
940139 (1) ·
940140 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'2mi. East of SR-91 ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'I-4 Connector over US-92 ' (1) ·
'Palm Beach Garden Interch' (1) ·
'SR-704 Over SR-91 ' (1) ·
I-95 over Addison Canal (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)