Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'CYPRESS CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'EL RIO CANAL ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Jupiter Creek ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'RCA CANAL ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR-91 Turnpike ' (1)
'CR-812 OCEAN AVE ' (1) ·
'EB Okee. Blvd. ' (1) ·
'FLYING COW ROAD ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD (SB) ' (1) ·
'JOG ROAD SB ' (1) ·
'LINTON BLVD. ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'NW 7TH STREET ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PALMWOOD ROAD ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
930418 (1) ·
930420 (1) ·
931013 (1) ·
934136 (1) ·
934139 (1) ·
934222 (1) ·
934292 (1) ·
934346 (1) ·
934369 (1) ·
934468 (1) ·
934469 (1) ·
934483 (1) ·
934913 (1) ·
934918 (1) ·
934934 (1) ·
934935 (1) ·
935221 (1)
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'AT SR-80 ' (1) ·
'Palm Beach Garden Interch' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-704 Over SR-91 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)