Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'CSX-RR ' (1) ·
'E-1 Canal ' (1) ·
'Long Creek ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'SR 70 ' (1) ·
'SR-91 Turnpike ' (1) ·
'St. Lucie River ' (1) ·
'St.Lucie River ' (1) ·
'Troup Indiantown Canal ' (1)
'Atlantic Ave. ' (1) ·
'Boynton Beach Blvd' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'E/B S.R. A1A ' (1) ·
'EB Okee. Blvd. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'SR-44 ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'W/B S.R. A1A ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
790176 (1) ·
890158 (1) ·
890160 (1) ·
894053 (1) ·
930418 (1) ·
930463 (1) ·
930464 (1) ·
934346 (1) ·
934468 (1) ·
934469 (1) ·
934913 (1) ·
940135 (1) ·
940139 (1) ·
940140 (1)
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'2mi. East of SR-91 ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'Boynton Bch Blvd at SR-7 ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'SR-44 over CSX-RR ' (1) ·
'SR-704 Over SR-91 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)