Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'C-51 CANAL ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'CYPRESS CREEK ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'Jupiter Creek ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Rose Bay ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'WARNER CREEK ' (1) ·
Tillman Canal (1)
'DIXIE HIGHWAY ' (1) ·
'FLYING COW ROAD ' (1) ·
'Indiantown Road ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'NB SR-615 ' (1) ·
'PALMWOOD ROAD ' (1) ·
'SB SR- 615 ' (1) ·
'SB SR-615 ' (1) ·
'SR-715 ' (1) ·
'SR70 WB Okeechobee' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-1SB ' (1) ·
SR-507 SB (1)
700190 (1) ·
790155 (1) ·
790157 (1) ·
790159 (1) ·
790162 (1) ·
890113 (1) ·
930420 (1) ·
930471 (1) ·
934136 (1) ·
934292 (1) ·
934934 (1) ·
934935 (1) ·
940136 (1) ·
940146 (1) ·
940147 (1) ·
940148 (1) ·
940149 (1)
'0.1MI N of DONALD ROSS RD' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1mi. West of CR-613 ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'AT SR-80 ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'US-1 NB over Rose Bay ' (1) ·
'US-1 SB - Spruce Creek ' (1) ·
'US-1 SB-Spruce Creek ' (1) ·
'US-1SB - Spruce Cr. S. ' (1) ·
SR-507 SB-Tillman Canal (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)