Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E Gateway Blvd ' (1) ·
'EB Okee. Blvd. ' (1) ·
'HOOD RD 110.944 ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'NB I 95 to Gateway' (1) ·
'NW 7TH STREET ' (1) ·
'PALMWOOD ROAD ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'Tangerine Drive ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
930418 (1) ·
930433 (1) ·
930434 (1) ·
930435 (1) ·
930441 (1) ·
930800 (1) ·
934136 (1) ·
934346 (1) ·
934468 (1) ·
934469 (1) ·
934913 (1) ·
934945 (1) ·
934946 (1) ·
935221 (1) ·
940135 (1)
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'SR-704 Over SR-91 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)