Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Canal - D ' (1) ·
'E-4 CANAL ' (1) ·
'FL TPK (SR-91) ' (1) ·
'Halifax River ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lateral C Canal ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'Rowland Canal ' (1) ·
'Thompson River ' (1) ·
'Tide Relief Canal ' (1)
'10TH AVE NORTH ' (1) ·
'27TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CLINT MOORE RD ' (1) ·
'Lake Worth Road ' (1) ·
'LYONS ROAD ' (1) ·
'Military Trail ' (1) ·
'MINER RD. ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Roebuck Road ' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR-44 ' (1) ·
'SR-A1A ' (1) ·
'US-98 (SR-80) ' (1) ·
'West Farms Road ' (1) ·
'Willow Run Blvd. ' (1)
790147 (1) ·
790148 (1) ·
790151 (1) ·
790152 (1) ·
796401 (1) ·
884076 (1) ·
885809 (1) ·
894056 (1) ·
930361 (1) ·
930402 (1) ·
930413 (1) ·
930525 (1) ·
934138 (1) ·
934283 (1) ·
934293 (1) ·
934318 (1) ·
934348 (1) ·
934731 (1) ·
934929 (1) ·
934942 (1)
'.2mi W of Clyde Morris Bl' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-A1A over Halifax River' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)