Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Callalisa Creek ' (1) ·
'Canal - D ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'Halifax River ' (1) ·
'I-4 ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'LWDD E-1 Canal ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'SR 811 & FEC RR ' (1) ·
'St Johns River Relief ' (1) ·
'Thompson River ' (1) ·
'Tide Relief Canal ' (1) ·
'US-17-92-St Johns River ' (1) ·
'West Palm Beach Canal ' (1) ·
Horse Creek (1)
'Belvede to NB I-95' (1) ·
'EB SR 786 ' (1) ·
'Enterprise Rd. ' (1) ·
'I-4 EB ' (1) ·
'Lake Worth Road ' (1) ·
'Military Trail ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR-415 ' (1) ·
'SR-44 ' (1) ·
'SR-520 ' (1) ·
'SR-A1A ' (1) ·
'US-98 (SR-80) ' (1) ·
'WB SR 786 ' (1) ·
US-1 (1)
700206 (1) ·
700208 (1) ·
790147 (1) ·
790148 (1) ·
790151 (1) ·
790152 (1) ·
790191 (1) ·
790197 (1) ·
790198 (1) ·
930361 (1) ·
930402 (1) ·
930409 (1) ·
930410 (1) ·
930413 (1) ·
930478 (1) ·
930485 (1) ·
930491 (1) ·
930492 (1) ·
934138 (1) ·
940152 (1)
'0.7 mi south of PGA Blvd.' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1st overpass east of I-95' (1) ·
'4 miles west of SR 7 ' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'Just N. of Southern Blvd ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'North of Belvedere Rd ' (1) ·
'SR-415 - St Johns Relief ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-520 - Banana River ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-A1A over Halifax River' (1) ·
US-1 over Horse Creek (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)