Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 W.P.B. CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LATERAL B CANAL ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'St Johns River ' (1) ·
'Thompson River ' (1) ·
'Tide Relief Canal ' (1) ·
'West Palm Beach Canal ' (1) ·
Six Mile Creek (1)
'10TH AVE NORTH ' (1) ·
'16TH ST ' (1) ·
'27TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CR-512 ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'DONALD ROSS RD WB ' (1) ·
'Military Trail ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'OKEELANTA RD. ' (1) ·
'SR-44 ' (1) ·
'SR-520 WB ' (1) ·
'SR-714 ' (1) ·
'SR-A1A ' (1) ·
'US-98 SR700 US441 ' (1) ·
SR-46 (1)
700194 (1) ·
700200 (1) ·
790151 (1) ·
884065 (1) ·
884066 (1) ·
884068 (1) ·
885809 (1) ·
890159 (1) ·
930361 (1) ·
930409 (1) ·
930465 (1) ·
934138 (1) ·
934160 (1) ·
934293 (1) ·
934318 (1) ·
934348 (1) ·
934522 (1)
'0.2 MILE WEST OF US-1 ' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'A1A on Singer Island ' (1) ·
'AT US-27 ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-520 WB -St Johns River' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-700 CANAL POINT ' (1) ·
'Turnpike at Stuart exit. ' (1) ·
SR-46 over Six Mile Cr (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)