Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51/WEST PALM BCH CANAL' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'E-4 CANAL ' (1) ·
'L-14 CANAL ' (1) ·
'L-30 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'M CANAL ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'10TH AVE NORTH ' (1) ·
'27TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'BOB W RD 130TH ST.' (1) ·
'BROWNS FARM/CR-827' (1) ·
'CLINT MOORE RD ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARINA BLVD. ' (1) ·
'MILITARY TRAIL ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MINER RD. ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1)
885809 (1) ·
934151 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934293 (1) ·
934315 (1) ·
934318 (1) ·
934345 (1) ·
934348 (1) ·
934488 (1) ·
934518 (1) ·
934925 (1) ·
934926 (1) ·
934929 (1) ·
934936 (1) ·
934937 (1) ·
934942 (1) ·
934943 (1) ·
934944 (1)
'0.2 MILE WEST OF US-1 ' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)