Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Canal - D ' (1) ·
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'E-1 CANAL ' (1) ·
'E-4 CANAL ' (1) ·
'Halifax River ' (1) ·
'L-30 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Thompson River ' (1) ·
'TIDAL CANAL ' (1) ·
'Tide Relief Canal ' (1) ·
'West Palm Beach Canal ' (1) ·
'WILLOUGHBY CREEK ' (1)
'BINKS FOREST DRIVE' (1) ·
'Boynton Bch Blvd. ' (1) ·
'HOOD RD 110.944 ' (1) ·
'INDIAN STREET ' (1) ·
'Military Trail ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MINER RD. ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'NB US-441 (SR-7) ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SIMARA STREET ' (1) ·
'SR-44 ' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'US-98 (SR-80) ' (1)
790147 (1) ·
790151 (1) ·
894040 (1) ·
895504 (1) ·
930361 (1) ·
930402 (1) ·
930409 (1) ·
930410 (1) ·
930428 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930438 (1) ·
930441 (1) ·
934138 (1) ·
934293 (1) ·
934922 (1) ·
934923 (1) ·
934925 (1) ·
934926 (1) ·
934936 (1) ·
934937 (1) ·
934942 (1)
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'4 miles west of SR 7 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-7 & SR-80 intersection' (1)
26195316 (1) ·
26195370 (1) ·
26212592 (1) ·
26212629 (1) ·
26290244 (1) ·
26290245 (1) ·
26312802 (1) ·
26313526 (1) ·
26313548 (1) ·
26314057 (1) ·
26314099 (1) ·
26315179 (1) ·
26332602 (1) ·
26404695 (1) ·
26404846 (1) ·
26405713 (1) ·
26405778 (1) ·
26490902 (1) ·
26494457 (1) ·
26515528 (1) ·
27102110 (1) ·
27111660 (1) ·
29014444 (1) ·
29083964 (1)
80022456 (1) ·
80050618 (1) ·
80061936 (1) ·
80072101 (1) ·
80072169 (1) ·
80074430 (1) ·
80075210 (1) ·
80101305 (1) ·
80101307 (1) ·
80101974 (1) ·
80101977 (1) ·
80102132 (1) ·
80102271 (1) ·
80102293 (1) ·
80112090 (1) ·
80120775 (1) ·
80120925 (1) ·
80121064 (1) ·
80121067 (1) ·
80123610 (1) ·
80162947 (1) ·
80172828 (1) ·
80541414 (1) ·
80590233 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)